TRENDING Home & Living · HDB

November 2026 BTO Launch: Sembawang Anchor, Bayshore Oasis, Plantation Dew & Latest Details

HDB’s November 2026 BTO exercise is live with 7,964 flats across seven projects. Compare classifications, starting prices, wait times and the 11 November application deadline.

November 2026 BTO Launch: Sembawang Anchor, Bayshore Oasis, Plantation Dew & Latest Details

The November 2026 BTO launch is open until 11 Nov, with 7,964 flats across seven projects including Sembawang Anchor, Bayshore and Plantation Dew.

Application window
4–11 Nov 2026, closes 11.59pm
Supply
7,964 flats across 7 projects
Fastest project
Sembawang Anchor — about 2 years 10 months
Classifications
3 Standard · 3 Plus · 1 Prime
Key rule
Valid HFE / eligible in-process HFE arrangements required

HDB’s November 2026 BTO exercise is live with 7,964 flats across seven projects. Compare classifications, starting prices, wait times and the 11 November application deadline.

At a glance

Key Takeaways

  • HDB’s November exercise is already open; applications close 11 November at 11.59pm.
  • Sembawang Anchor offers 1,310 Shorter Waiting Time flats with an estimated 2 years 10 months wait.
  • Bayshore Sails, Bayshore Oasis and Merpati Meadow are Plus projects; Toa Payoh Hillside is Prime.
  • Selection is by computer ballot, not first-come-first-served.

The November 2026 BTO exercise is now open

HDB launched 7,964 BTO flats across seven projects on 4 November 2026. Applications are open through 11 November 2026 at 11.59pm. This is an eight-day application window, and HDB allocates flats by computer ballot rather than on a first-come-first-served basis, so there is no advantage in submitting an application in the first few minutes.

The seven projects span Bedok, Geylang, Sembawang, Tengah, Toa Payoh and Yishun. Three are Standard projects, three are Plus projects and one is Prime. This is also the first BTO exercise since the monthly household income ceilings were raised to S$16,000 for families and S$8,000 for singles. If you need the eligibility context first, read our HDB income ceilings 2026 guide.

All seven November 2026 BTO projects

TownProjectClassificationWhat stands out
SembawangSembawang AnchorStandard1,310 Shorter Waiting Time flats; about 2 years 10 months
TengahPlantation DewStandardWhite Flats for 3-room, 4-room and 5-room units
YishunChencharu AcresStandard2-room Flexi through 5-room choices
BedokBayshore SailsPlusNew Bayshore estate; 3-room and 4-room options plus 2-room Flexi supply across Bayshore
BedokBayshore OasisPlus855 flats; about 3 years 2 months; near Bayshore MRT
GeylangMerpati MeadowPlusCentral-fringe Plus project with 8% subsidy recovery
Toa PayohToa Payoh HillsidePrimeNext to Caldecott MRT; 4-room, 2-room Flexi and Community Care Apartments

The classification matters beyond the initial selling price. Plus and Prime flats come with additional subsidies and tighter resale conditions, including a 10-year Minimum Occupation Period. HDB has set subsidy recovery at 8% for Merpati Meadow, 9% for Bayshore Sails and Bayshore Oasis, and 11% for Toa Payoh Hillside.

Sembawang Anchor: the fastest-moving option

Sembawang Anchor is likely to attract buyers who place a high value on moving in sooner. HDB says its 1,310 flats have a waiting time of about 2 years and 10 months, making all 1,310 units Shorter Waiting Time flats. The project includes 2-room Flexi, 3-room, 4-room and 5-room flats.

Starting prices before grants are S$156,000 for 2-room Flexi, S$274,000 for 3-room, S$312,000 for 4-room and S$479,000 for 5-room flats. HDB’s illustrative after-grant starting prices begin from S$36,000, S$169,000, S$232,000 and S$424,000 respectively, but your actual grant depends on household income and eligibility.

Bayshore Oasis and Bayshore Sails: east-side Plus projects

Bayshore is the major east-side draw. Bayshore Oasis has 855 flats and an estimated waiting time of about 3 years and 2 months. It is bounded by Bayshore Drive and Bayshore Walk, with access to Bayshore MRT on the Thomson-East Coast Line and future connectivity through Bedok South MRT.

HDB lists Bayshore’s starting prices from S$208,000 for 2-room Flexi, S$409,000 for 3-room and S$559,000 for 4-room flats before grants. Because Bayshore Sails and Bayshore Oasis are Plus projects, buyers should weigh the locational advantage against the longer 10-year MOP and the 9% subsidy recovery when the flat is eventually sold.

Plantation Dew: White Flats reach 5-room units

Plantation Dew in Tengah offers 710 flats and an estimated waiting time of about 3 years and 2 months. It is notable for offering White Flats — open-concept units without internal partition walls between the living and bedroom spaces — for 3-room, 4-room and, for the first time, 5-room flats.

HDB says White Flat prices are lower than the default layout by S$6,000 for 3-room, S$8,600 for 4-room and S$9,000 for 5-room units because certain walls and electrical points are not provided. Buyers who prefer a conventional internal layout can still choose the default option.

Starting prices at a glance

Among the Standard projects, HDB’s published starting prices before grants include S$131,000 for a 2-room Flexi at Plantation Dew, S$266,000 for a 3-room there and S$339,000 for a 4-room. Chencharu Acres starts from S$151,000 for 2-room Flexi, S$297,000 for 3-room, S$353,000 for 4-room and S$484,000 for 5-room flats.

For the Plus projects, Bayshore starts from S$208,000 for 2-room Flexi, S$409,000 for 3-room and S$559,000 for 4-room flats. Merpati Meadow starts from S$253,000 for 2-room Flexi and S$545,000 for 4-room flats. Toa Payoh Hillside’s Community Care Apartments start from S$151,000 before grants; the project also includes 2-room Flexi and 4-room flats on the HDB Flat Portal.

How to apply before 11 November

You need a valid HDB Flat Eligibility letter, or an HFE application already being processed under HDB’s stated arrangements, to participate. HDB’s HFE application e-service is temporarily unavailable from 4 to 11 November while resources are prioritised for the sales exercise; it resumes on 12 November.

Applicants can apply for one flat type in one town during the exercise. HDB updates application rates several times daily, so it is sensible to compare demand before the deadline if you are flexible about project and flat type. Do not treat early application counts as final demand, and remember that ballot selection is not first-come-first-served.

Which project should you shortlist?

If waiting time is your priority, Sembawang Anchor is the clearest standout. If east-side location and rail access matter more, the Bayshore Plus projects deserve closer attention. Plantation Dew offers an unusual degree of layout flexibility through White Flats. Buyers who prioritise a mature central location may be drawn to Toa Payoh Hillside, but Prime conditions and subsidy recovery should be part of that decision, not an afterthought.

The best project is therefore not simply the one with the lowest headline starting price. Compare your HFE result, monthly mortgage comfort, expected household changes, MOP implications, transport needs and how long you expect to stay in the flat.

Frequently asked questions

When does the November 2026 BTO application close?

Applications close on 11 November 2026 at 11.59pm.

How many flats are in the November 2026 BTO launch?

HDB launched 7,964 flats across seven projects.

Is Sembawang Anchor a Shorter Waiting Time project?

Yes. HDB says all 1,310 flats at Sembawang Anchor have a waiting time of about 2 years and 10 months.

Are Bayshore Oasis and Bayshore Sails Standard or Plus?

Both are classified as Plus projects, with a 9% subsidy recovery rate.

Can I submit more than one BTO application?

For this sales exercise, applicants choose one flat type in one town. Selection is by computer ballot, not submission order.